
Have Vendor Approval and have coated three valves on a trial basis. Should be back in March to remove the coating to evaluate. Watch out for the case study.
Have Vendor Approval and have coated three valves on a trial basis. Should be back in March to remove the coating to evaluate. Watch out for the case study.